Skip to main content

Anaya Patel

Computer Science Student

Learning, building, growing every day.

About Me

I'm a Computer Science major with a minor in Data Science. I'm passionate about building technology that makes a positive impact. When I'm not studying, I'm hacking on side projects, competing in hackathons, or tutoring fellow students.
I've won 3 hackathons in the last year
My dorm room has more monitors than furniture
I tutor 5 students weekly in data structures
I've read every Paul Graham essay twice

Education

B.S. in Computer Science — Minor in Data Science
State University
Aug 2022 — May 2026
GPA 3.9/4.0. Dean's List all six semesters. Relevant coursework: Data Structures & Algorithms, Machine Learning, Distributed Systems, Database Systems, and Human-Computer Interaction. Teaching assistant for CS 201 (Data Structures).
High School Diploma — STEM Honors Track
Lincoln High School
Aug 2018 — Jun 2022
Graduated valedictorian with a 4.0 GPA. Founder and president of the Robotics Club, leading the team to a regional FIRST Robotics championship.

Skills

Technical

Python 80%
JavaScript 75%
HTML / CSS 85%
SQL 70%

Academic

Research Methods 85%
Technical Writing 80%
Data Analysis 75%
Public Speaking 70%

Soft Skills

Teamwork 90%
Problem Solving 85%
Time Management 80%

Featured Projects

SmartCampus — Capstone Project

SmartCampus — Capstone Project

An IoT-powered campus management system that monitors room occupancy, HVAC efficiency, and energy consumption. Won Best Capstone Project award and reduced energy costs by 18% in pilot.

Python React Raspberry Pi MQTT
MealBuddy — Hackathon Winner

MealBuddy — Hackathon Winner

Built in 36 hours at HackMIT. An app that matches students with leftover meal swipes to those in need. Won 1st place and the social impact award. Now used by 3 universities.

React Native Firebase Node.js
Bias in Hiring Algorithms — Research Paper

Bias in Hiring Algorithms — Research Paper

Undergraduate research on detecting and mitigating bias in ML-based hiring tools. Analyzed 5 commercial systems and proposed a fairness-aware re-ranking algorithm. Published at the FAccT student track.

Python scikit-learn Fairness Metrics LaTeX
StudyTogether — Volunteer Platform

StudyTogether — Volunteer Platform

A peer tutoring platform connecting upperclassmen with freshmen. Built as a volunteer project, now used by 500+ students. Features video calls, scheduling, and progress tracking.

Next.js PostgreSQL WebRTC Vercel

By the Numbers

3.9 GPA
42 Courses Completed
5 Hackathons Won
200+ Volunteer Hours

Internships & Experience

Software Engineering Intern
Stripe
Jun 2025 — Aug 2025 · Remote
Joined the Payments Reliability team for a summer internship. Shipped an internal dashboard that surfaces latency anomalies across services, cutting incident triage time by roughly 30%. Wrote unit and integration tests and presented my work at the intern demo day.
Go React TypeScript Observability
Undergraduate Research Assistant
State University — Fairness in AI Lab
Sep 2024 — May 2025 · On Campus
Conducted research on bias in machine learning hiring systems under Dr. Robert Kline. Built evaluation pipelines, ran experiments across 5 commercial models, and co-authored a paper accepted to the FAccT student track.
Python scikit-learn Research ML Fairness
Teaching Assistant — CS 201 Data Structures
State University
Jan 2024 — Present · On Campus
Lead two weekly lab sections of 25+ students, hold office hours, and grade assignments. Created supplementary practice problems on trees and graphs that the department adopted course-wide.
Teaching Java Algorithms Mentoring

Achievements & Awards

1st Place — HackMIT

MIT Oct 2024

Best Capstone Project Award

State University, CS Department May 2025

Dean's List (6 Semesters)

State University 2022 – 2025

Contact

Let's build something together

I'm actively looking for new-grad software engineering roles and summer 2026 opportunities. Whether you'd like to chat about a project, a referral, or just say hi, my inbox is always open.

Name is required.
Valid email is required.
Message is required.
Thank you! I'll get back to you soon.

Scan to save my contact

Download vCard
ColorsSunshineBerry PopCoral Crush